Production building of the contemporary era.
This building requires a two lane road connection to the Town Hall.
Efficiency[]
151.2 per tile and hour.[1]
Production Options[]
Item | Name | Production Time | Amount |
---|---|---|---|
Coffee Break | 00:05:00 | 600 | |
Meeting | 00:15:00 | 1,510 | |
Presentation | 01:00:00 | 3,780 | |
Conference | 04:00:00 | 6,040 | |
Business Trip | 08:00:00 | 9,060 | |
Contract | 24:00:00 | 18,130 |
Notes[]
- ↑ Efficiency is measured by an assumed maximum production per hour (with the 1-hour-production option) divided by the number of tiles that the actual building occupies. To be used as a simple and objective comparison towards other production buildings.